DMG Air Cooled Chiller


Basic feature
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
What we use in production
Plastic IndustryInjection molding cooling and extruder temperature management

Chemical Industry
Reactor cooling, distillation control, material storage temperature regulation
Food Industry
Food processing cooling, cold storage, preservation systems
Packing IndustryTemperature control for plastic film cooling and printing equipment
CheckOut Our Work Process

01
Cutting

02
Welding

03
Assembling

04
Electrical assembly

05
FAQ
1. Chiller Selection & Sizing
Q: How to choose a suitable chiller? A: Judge by cooling demand, space, energy efficiency, local temperature and water supply. Send us your equipment parameters for matching.
Q: How to calculate cooling capacity? A: Cooling Capacity (kW) = Flow Rate (m³/h) × Temperature Difference / 0.86
Q: Can the chiller heat water? A: Yes, via electric heating. Please tell us your required temperature or heating capacity.
2. Principle & Product Features
Q: How does a chiller work? A: It works on refrigeration cycle, absorbing process heat through water circulation and releasing it via refrigerant.
Q: What are the advantages of air-cooled chillers? A: Easy installation, small footprint, low upfront cost, water-saving, and no scaling risk in poor water areas.
Q: Best operating environment for air-cooled chillers? A: Ventilated, dry, dust-free and moderate temperature. No wastewater or exhaust during operation.
Q: How to choose refrigerant? A: Choose from R22, R407C, R134A based on chiller model, capacity and local regulations.
3. Maintenance & Troubleshooting
Q: What is the maintenance cycle? A: Recommended every 6–12 months, subject to actual usage and equipment manual.
Q: How to prevent condenser scaling? A: Clean regularly, use quality cooling water and install water treatment devices.
Q: How to handle common faults? A: Frequent start-stop: check refrigerant level and water blockage. Abnormal noise: check expansion valve and compressor.
4. Order & Delivery
Q: What is the production lead time? A: About 15–45 days.
Hot Tags: 5hp small-tonnage industrial chiller, China 5hp small-tonnage industrial chiller manufacturers, suppliers, factory






