
• The installation foundation must be level, with a maximum horizontal tilt angle not exceeding 5 degrees;
• The foundation load-bearing capacity must support the unit's maximum operating weight;
• Reserve at least 1 meter of maintenance space around the unit;
• Avoid sources of strong electromagnetic interference;
• Avoid high-temperature heat sources;
• Avoid strong corrosive vapors;
• Avoid dust pollution sources;
• Avoid flammable or explosive environments.
• Provide drainage ditches around the unit for condensate removal during maintenance and cleaning;
• Ensure the equipment room has sufficient space for process piping layout, with adequate lighting and ventilation.


